Welcome to Best Demolition Pty Ltd

Faq's

Faq's

Day 1: What safety standards does Best Demolition follow?

Best Demolition strictly follows all local, state, and federal Work Health & Safety (WHS) guidelines in Australia. We conduct thorough risk assessments, implement control measures, and ensure every team member is trained and certified.

Day 2: Is Best Demolition licensed for asbestos removal?

Yes, Best Demolition is fully licensed for Class B asbestos removal, following all Safe Work Australia and EPA regulations. We use industry-grade containment systems and ensure safe disposal at approved facilities.

Day 3: How does Best Demolition ensure compliance on job sites?

We ensure compliance by:

  • Conducting pre-site inspections and risk assessments
  • Training staff on latest WHS standards
  • Using certified operators and licensed equipment
  • Maintaining documentation for every step of the project

Day 4: Why is safety important in demolition work?

Demolition involves hazardous materials, structural risks, and heavy machinery. Safety ensures the protection of workers, surrounding structures, and the environment. At Best Demolition, safety isn’t optional — it’s a priority on every project.

Day 5: Does Best Demolition handle hazardous waste disposal?

Yes, we safely handle and dispose of hazardous materials, including asbestos and contaminated rubble. All waste is transported to EPA-approved facilities as per environmental compliance standards.

Day 6: Are your wet hire operators certified and insured?

Absolutely. All our wet hire operators are:

  • Fully licensed
  • WHS-compliant
  • Experienced in high-risk environments
  • Covered by appropriate insurance policies

Day 7: What kind of PPE and safety measures are used during demolition?

We use full personal protective equipment (PPE), including respirators, coveralls, safety boots, gloves, helmets, and eye protection. Additional measures like dust suppression, fencing, and exclusion zones are also in place.

Day 8: Does Best Demolition provide documentation for compliance?

Yes. We provide all necessary documentation, including:

  • Safe Work Method Statements (SWMS)
  • Asbestos Clearance Certificates
  • Waste disposal dockets
  • WHS compliance reports

Day 9: Can Best Demolition work in live or occupied environments?

Yes, we have extensive experience with strip-outs and hand demolition in live environments like commercial buildings and residential complexes. We follow noise, dust, and access control protocols to ensure minimal disruption and maximum safety.

Day 10: What happens if a safety incident occurs during a project?

While incidents are rare due to our strict safety protocols, we are prepared with:

  • Emergency response plans
  • First-aid trained staff
  • Incident reporting systems
  • Immediate corrective actions
Faq


Leave a Message